Share the city, property type, and service you need. It takes about a minute, and no payment is collected.
02
We confirm availability
HomeTame reviews your address, recommends a plan, and follows up by email or phone.
03
We watch, report, and coordinate
Visits start, photo updates arrive, and approved vendor work is coordinated for you.
Property Project Management
For already-vacant rental recovery, turnover, and multi-contractor repairs, HomeTame coordinates approved providers, authorized access, task tracking, photos, and owner updates. Scope and availability are confirmed before work begins.
A digital property report records what was checked and observed during a scheduled visit. Depending on the service, it may include:
Property status and completed Home Watch checklist
Current photos of accessible areas and property conditions
Observations and visible concerns requiring attention
Potential issues clearly identified
Recommended follow-up when appropriate
Areas a report may document
The visit checklist and report may cover doors and windows, visible water or moisture, HVAC and temperature, electrical or power concerns, plumbing observations, pools and landscaping, pests, storm or weather damage, mail or packages, unusual activity, and other agreed areas.
Understand what a report can tell you
A report documents observations made during a visit and can help you decide what to do next. It cannot confirm hidden or inaccessible conditions, predict future problems, or replace a licensed inspection or technical assessment.
What a report looks like
Each report is organized so you can read it in a couple of minutes and decide what to do next:
The date of the visit and the areas that were checked
A checklist showing what was checked and what was not accessible
Dated photos of the exterior, entry points, interior rooms and any area of concern
Written notes in plain language that separate observations from diagnoses
A suggested next step for anything that needs attention, such as a repair, a pro visit or a follow-up check
From a report to a repair
If a visit finds something that needs work, the report is where the next step starts. HomeTame can handle many small repairs directly, including handyman work, junk removal and property cleanup, and can coordinate a local pro for trade work. You approve the scope and price before anything is scheduled, and you can use the free estimator to see a planning price first.
Reports are most useful when you cannot be at the property regularly:
Second-home and vacation-home owners
Snowbirds and seasonal residents
Owners of vacant or rental properties between tenants
Out-of-town heirs and estate managers
Owners waiting on a sale, a repair or a contractor
Go beyond photos with a live video walkthrough
If you would rather see a property or a project as it happens, a live video walkthrough can be arranged in advance, subject to scheduling and a safe visit.
Each report is a dated record of the property after a visit.
Photos of the areas checked, taken at each visit
A checklist showing what was looked at and what was not accessible
Written notes about anything unusual
Recommended next steps, with nothing done until you approve
Why the record matters
Dated photos give you a history of the home. They help you decide on repairs, share condition with a contractor, and back up an insurance or sale conversation. A report is an observation, not an inspection.
Reports document visual observations from the visit. They are not a licensed inspection, engineering assessment, alarm-monitoring service, or guarantee about conditions outside the areas checked.
Sample visit report
See what you receive after a visit.
Reports combine photos, a checklist, and notes on anything unusual. The items shown depend on your plan and the accessible areas. This is an illustrative example.
When repairs or projects are underway, a Project Progress Report can show before, in-progress, and current photos, project status, items of concern, notes, and the next expected step. Illustrative example only.
A report may include the visit date, a checklist of what was checked, dated photos, written observations, any visible concerns and a suggested next step. What it covers depends on the service plan and the areas that were accessible.
Is a property report the same as a home inspection?
No. A report documents visual observations from a scheduled visit. It is not a licensed inspection, engineering assessment or alarm-monitoring service, and it cannot confirm hidden or inaccessible conditions.
What happens if a visit finds a problem?
The report identifies it and suggests a next step. HomeTame can handle many small repairs and cleanups directly or coordinate a local pro, and you approve the scope and price before any work is scheduled.
Can I see my property live instead of waiting for photos?
Live video walkthroughs can be arranged in advance, subject to scheduling and a safe visit. Use the live video walkthrough page to request one.
Can I request a report with no payment?
You can check availability without paying. HomeTame confirms coverage for your address and the service plan before anything is scheduled.
Request service
Request photo updates.
Hi, and thanks for stopping by. Tell us a little about your home and what you need, and a real person at HomeTame will get back to you about availability and next steps. There is no obligation, and no payment is collected on this website.
Nothing is scheduled and no work begins until you approve the scope and price. HomeTame confirms availability before arranging service.
Please do not include passwords, alarm or access codes, or payment details in the form. In an emergency, call 911 first.